Return of fairing for the NORDET
This Monday, March 18th, the ship “NORDET” was back from ST-Johns after having carried out its annual refit. The ship had left the port of Saint-Pierre on March 4th. Scheduled maintenance work requiring the dry docking of the vessel was completed within the required time.On the night of Monday to Tuesday, around 1 am, the ship “SUROIT” left in turn towards St-Johns.After 10 hours of navigation, it arrived at the port and would have to stay there about fifteen days to undergo as his twin brother his obligatory annual visit.
Category : SPM Ferries