22 March 2019

Return of fairing for the NORDET

This Monday, March 18th, the ship “NORDET” was back from ST-Johns after having carried out its annual refit. The ship had left the port of Saint-Pierre on March 4th. Scheduled maintenance work requiring the dry docking of the vessel was completed within the required time.On the night of Monday to Tuesday, around 1 am, the ship “SUROIT” left in turn towards St-Johns.After 10 hours of navigation, it arrived at the port and would have to stay there about fifteen days to undergo as his twin brother his obligatory annual visit.

Nordet quittant St-Johns

Category :